Welcome to DU!
The truly grassroots left-of-center political community where regular people, not algorithms, drive the discussions and set the standards.
Join the community:
Create a free account
Support DU (and get rid of ads!):
Become a Star Member
Latest Breaking News
Editorials & Other Articles
General Discussion
The DU Lounge
All Forums
Issue Forums
Culture Forums
Alliance Forums
Region Forums
Support Forums
Help & Search
West Virginia
Related: About this forumHawks Nest Tunnel to rise from the depths for first time in 85 years
Hawks Nest Tunnel to rise from the depths for first time in 85 years
By Rick Steelhammer Staff writer Aug 11, 2020
A worker stands outside the Hawks Nest Tunnel during construction in 1930.
Elkem Metals Collection, West Virginia State Archives
The Hawks Nest Tunnel, the 3.1-mile-long man-made channel through Gauley Mountain that exposed thousands of Great Depression-era workers to lethal concentrations of silica dust, is scheduled to be inspected for the first time since it began operating as a conduit for a hydroelectric plant in 1936.
A 25-foot draw-down of Hawks Nest Reservoir will begin Sept. 8 to accommodate the inspection, according to Brookfield Renewable, the owner of the Hawks Nest Dam. The lake will remain at the lowered level until Nov. 8, when the process of restoring it to its normal elevation will begin.
{snip}
Some public access and recreation activities in the vicinity of the dam and powerhouse will be affected by the draw-down, including the tailrace fishing pier and parking area adjacent to the powerhouse, scheduled to temporarily close on Aug. 24. A hiking and biking trail stretching from a parking area near the W.Va. 16 bridge at Cotton Hill to the base of Hawks Nest Dam already is closed and will remain so through the duration of the inspection.
{snip}
From the base of Hawks Nest Dam to Gauley Bridge, the 6-mile stretch of New River known as the Dries will be wetter than usual this fall because of the inspection, since no water will be diverted through the tunnel, which can handle up to 10,000 cubic feet per second. The full flow of the New will pass through the Dries during the inspection period.
{snip}
The Hawks Nest Tunnel was completed months ahead of schedule by workers who labored six days a week on 10- to 12-hour shifts to drill and blast their way more than 3 miles through Gauley Mountain sandstone. The workers were issued no protective breathing gear to filter silica dust from the air.
According to Martin Cherniack, the medical doctor who wrote The Hawks Nest Incident: Americas Worst Industrial Disaster, at least 764 of the 1,213 people who worked in the tunnel for at least two months died from respiratory problems within five years of the tunnels completion.
The majority of the Hawks Nest workers were Black people from the South.
{snip}
Reach Rick Steelhammer at
rsteelhammer@wvgazettemail.com, 304-348-5169 or follow
@rsteelhammer on Twitter.
By Rick Steelhammer Staff writer Aug 11, 2020
A worker stands outside the Hawks Nest Tunnel during construction in 1930.
Elkem Metals Collection, West Virginia State Archives
The Hawks Nest Tunnel, the 3.1-mile-long man-made channel through Gauley Mountain that exposed thousands of Great Depression-era workers to lethal concentrations of silica dust, is scheduled to be inspected for the first time since it began operating as a conduit for a hydroelectric plant in 1936.
A 25-foot draw-down of Hawks Nest Reservoir will begin Sept. 8 to accommodate the inspection, according to Brookfield Renewable, the owner of the Hawks Nest Dam. The lake will remain at the lowered level until Nov. 8, when the process of restoring it to its normal elevation will begin.
{snip}
Some public access and recreation activities in the vicinity of the dam and powerhouse will be affected by the draw-down, including the tailrace fishing pier and parking area adjacent to the powerhouse, scheduled to temporarily close on Aug. 24. A hiking and biking trail stretching from a parking area near the W.Va. 16 bridge at Cotton Hill to the base of Hawks Nest Dam already is closed and will remain so through the duration of the inspection.
{snip}
From the base of Hawks Nest Dam to Gauley Bridge, the 6-mile stretch of New River known as the Dries will be wetter than usual this fall because of the inspection, since no water will be diverted through the tunnel, which can handle up to 10,000 cubic feet per second. The full flow of the New will pass through the Dries during the inspection period.
{snip}
The Hawks Nest Tunnel was completed months ahead of schedule by workers who labored six days a week on 10- to 12-hour shifts to drill and blast their way more than 3 miles through Gauley Mountain sandstone. The workers were issued no protective breathing gear to filter silica dust from the air.
According to Martin Cherniack, the medical doctor who wrote The Hawks Nest Incident: Americas Worst Industrial Disaster, at least 764 of the 1,213 people who worked in the tunnel for at least two months died from respiratory problems within five years of the tunnels completion.
The majority of the Hawks Nest workers were Black people from the South.
{snip}
Reach Rick Steelhammer at
rsteelhammer@wvgazettemail.com, 304-348-5169 or follow
@rsteelhammer on Twitter.
The worst industrial health disaster in US history came about due to silica.
I'm pretty sure it's number one. It was the drilling of a tunnel for a hydroelectric facility on the New River in West Virginia. The workers dug their way through silica-containing sandstone to create the tunnel.
Hawks Nest Tunnel disaster
Date
1931
Location
Gauley Bridge, West Virginia
Coordinates
38°07′20″N 81°07′42″W
Cause
occupational silicosis
Deaths
476 to 5,000 (estimated)
The Hawks Nest Tunnel disaster was a large-scale incident of occupational silicosis as the result of the construction of the Hawks Nest Tunnel near Gauley Bridge, West Virginia, as part of a hydroelectric project. This project is considered to be one of the worst industrial disasters in American history.
Date
1931
Location
Gauley Bridge, West Virginia
Coordinates
38°07′20″N 81°07′42″W
Cause
occupational silicosis
Deaths
476 to 5,000 (estimated)
The Hawks Nest Tunnel disaster was a large-scale incident of occupational silicosis as the result of the construction of the Hawks Nest Tunnel near Gauley Bridge, West Virginia, as part of a hydroelectric project. This project is considered to be one of the worst industrial disasters in American history.
Excavation of the Hawks Nest Tunnel, Gauley Bridge, WV, 1930-31, and Acute Silicosis
InfoView thread info, including edit history
TrashPut this thread in your Trash Can (My DU » Trash Can)
BookmarkAdd this thread to your Bookmarks (My DU » Bookmarks)
1 replies, 1505 views
ShareGet links to this post and/or share on social media
AlertAlert this post for a rule violation
PowersThere are no powers you can use on this post
EditCannot edit other people's posts
ReplyReply to this post
EditCannot edit other people's posts
Rec (10)
ReplyReply to this post
1 replies
= new reply since forum marked as read
Highlight:
NoneDon't highlight anything
5 newestHighlight 5 most recent replies
Hawks Nest Tunnel to rise from the depths for first time in 85 years (Original Post)
mahatmakanejeeves
Aug 2020
OP
DarthDem
(5,361 posts)1. What a horrible tragedy